    That’s the hilarious part. You watch Japan repair their roads after an earthquake in a weekend. Scheduled maintenance in the States takes weeks or months. Hell, one project near me took YEARS to finish.

    • Miles O'Brien@startrek.website
      link
      fedilink
      English
      arrow-up
      12
      ·
      edit-2
      4 months ago

      A road construction project within view of my old place could have been finished in 6 months, given the speed they set up 90% of it.

      All that was left was a small ramp and a slightly curved road.

      Then some locals found out that the plan for the surrounding fields (that had been untended and growing wild for almost a decade before hand) were going to be used for solar power.

      Suddenly they became very concerned about proper land surveys and impacts, supposedly solar installations bring in crime, and all kinds of other stall tactics.

      Well since they put the project on hold for over 5 years, the price of solar dropped a TON and when the bullshit finally got sorted, the solar field ended up being almost 3x the original intended power output.

      And the only crime that has happened as a result is occasionally they have to replace some panels because some good old boys keep taking pot shots at the panels. Normal people might call that “domestic terrorism” and do something about it, but the local sheriff didn’t seem go care until their offices needed renovating and they had to shack up down the street.

      Just a rambling way to say all the problems with the road projects around my area are caused by locals.

    • MonkeyTown@midwest.social
      link
      fedilink
      English
      arrow-up
      8
      arrow-down
      1
      ·
      4 months ago

      They took down all the overpass bridges near me, for whatever reason.

      They have been down for months already and the last handful of times I’ve driven by, the equipment has not moved at all. So they tore them out all at once, making getting into my town from the highway virtually impossible, and now aren’t even doing anything with them.

      Cool, cool, nobody needs to get here anyway.

      • mic_check_one_two@lemmy.dbzer0.com
        link
        fedilink
        English
        arrow-up
        4
        ·
        edit-2
        4 months ago

        This is often caused by multiple different crews working on differing schedules.

        The demo crew was told “have it done by [x] date, so the dirt levelers can get to work.” So the demo crew starts at the beginning of the work window.

        Then the dirt leveling crew is told “you have between [x] and [y] to get done, so the steel workers can come lay rebar.” The dirt levelers see that it can be done in three days, and their company over-committed on some other projects anyways, so they wait until the very end of their month-long window. This means the site sits demoed for an entire month before the levelers even show up.

        The steel workers are told “you have between [y] and [z] to get this done.” They start right at the beginning of their work window, meaning the dirt gets leveled and rebar almost immediately gets done. Then it sits for another month before the concrete crews start, because the concrete formers were told that they couldn’t start until [z]. Then the concrete needs to cure before the forms are removed, and grout/seal is applied. This takes another month, because the crew coming back to remove the forms is delayed on other projects. So the concrete just sits there for another month before the forms are removed, seams are sealed, and the road actually opens again.

        All in all, it was only like a week of actual work, but it took 3-4 months to complete, because of the massive delays in between each crew. And these delays are because every single company has over-committed their crews, (because none of them want to turn down work because they’re too busy, and later regret it), and requires a massive window to be able to schedule their crews at some point in that month.