• pedz@lemmy.ca
      link
      fedilink
      arrow-up
      11
      ·
      edit-2
      5 days ago

      The region where I’m from is trying to re purpose an abandoned rail line into a rail trail. The project dates from 2012 (in French). All the bureaucracy involved makes the process take forever. Meanwhile the extension of a multi lane highway plowed through a wooded area, some farmland, required the construction of a bridge, is now completed.

      Same for public transit always being cut, while highway extension is like the proverbial carrot on a stick for voters.

      VIA Rail won’t even take fucking bikes in the Corridor, yet! Going from Montreal to Drummondville with a bike involves paying $35 for the coach ticket, $15 for your bike, that must be in a box or a bag that they will sell you for $15 if you don’t have one, and pay the same again to get back! Oh and there’s two coaches per day, for your convenience. Also, even if you ditch the bike so you can take a train, it’s going to be seriously late.

      But if we’re so worried about the environment and quality of life, instead of trying to get everywhere using public transit and/or a bike, maybe we should buy an electric car. That’s a very good message from our “leaders”.