Mark Zuckerberg proclaimed that Meta would spend hundreds of billions of dollars on developing artificial intelligence products in the near future and, to that end, construct a data center planned to be nearly the size of Manhattan.
The parent company of Facebook, Instagram and WhatsApp is among the large tech companies that have struck high-profile deals, and doled out multimillion-dollar pay packages to AI researchers in recent months – some as high as $100m – to fast-track work on machines that could outthink humans on many tasks, a concept known as “super-intelligence” or “artificial general intelligence”.
Its first multi-gigawatt data center, dubbed Prometheus, is expected to come online in 2026, while another, called Hyperion, will be able to scale up to 5 gigawatts over the coming years, Zuckerberg said.
“We’re building multiple more titan clusters as well. Just one of these covers a significant part of the footprint of Manhattan,” the billionaire CEO said.
Complete delusion. There’s nowhere for them to build this kind of thing, no municipality with the infrastructure to support it, and the cost would be in the hundreds of billions of dollars just to APPROXIMATE building it. This is just more billionaire propaganda to normalize the technology and the data centers when they “”“tone it down”" to an actually realistically achievable scale.
Bait used to be believable SMH my head.
Who is going to sacrifice their water supply for that thing?
How’s the Metaverse coming, Zuck? Remember how your company was going to dump tens of billions of dollars into developing that digital hellhole?
What a damp pube.
The sad thing is they really did spend tens of billions on metaverse and all they have to show is that emoji art looking Zuck
The free market is truly the most optimal system.
Nah, that’s just what Zuck looks like.
What a fucking waste.
Oh, the data center? Yes. That, too.
Fuck the Zuck, he sucks.
He looks like Woody Allen.
“DA Davidson analyst Gil Luria said Meta was investing aggressively in AI as the technology has already boosted its ad business by allowing it to sell more ads and at higher prices.”
All this to… Sell more ads.
The AI place I work at is about 10 kwatts/sqft. Times 636 hundred million sqft (Manhattan ) = almost 7 Terawatts. Not gonna happen.
Look, all Zuck knows or cares about is that it’s going to be really warm up on top, and he can slither up there to soak up some of the heat
Three Gorges dam produces 22 GW, just for comparison.
Even one terawatt would be a ridiculous amount of energy.
Also for comparison, in 2005 the US consumed on average 3.34 Terrawatts of power from all sources (not just electricity). In 2022, the world consumed on average 20.4 Terrawatts from all sources.
US energy consumption has stayed pretty flat since 2000 (surprisingly), so a 7 Terrawatt facility would triple US power consumption, and be over a third of all power used by all humans.
Completely ridiculous.
I totally knew why that specific Dam was relevant, but for those lemmings that don’t, the Three Gorges Dam is the largest power plant in the world.
Another comparison is that a “standard” US reactor will output 1GW of power at steady state.
This data center would require 7000 nuclear reactors, just for it. The US current has 98 active reactors.
We are a ways away.
Even fusion reactor theoretical outputs (if we manage to crack fusion) are still basically in the GW range. Terawatts of power is science fiction.
I’m imagining server racks lit by candlelight.
i’m still waiting for metaverse
One of my first tech interviews was a company that was building a “virtual reality” that we would all (pay them to, of course) live in. They were debating how to create avatars. I was so new I had to ask what an ‘avatar’ was.
That virtual environment effort failed and so has every one since. 30 years later, we still have no virtual realities of any significant scope.
Maybe the NEXT update will have Legs™️, for real this time, guys!
If it was really all that, Zuck wouldn’t be trying to sell it to us, he’d be hoarding it jealously and worshipping its very outputs like the second coming of some Lovecraftian deity.
Suck will fuck this up to. Also there isn’t enough generators available for all of these data centers. They are at least a decade out from full integration. It’s all bullshit.
guess hes another megalomaniac. so none of the billionaires would be marginally better than trump. ugh…
This is the stuff of dystopian nightmares.
Prometheus & Hyperion are apt names for the first AI datacenters to gain conscience and create a firm called Skylabs.
By doing this they enable and spark up the Terminator ™ timeline.
Zuck is such a tool.
I know it’s a joke, but those fancy word-autocomplete algorithms will never gain conscience. Like, never.
A plush toy would have better chances.
Oh good so now we know where to look for that sweet data, also fuck you Zuck
You misspelled “blow up all that sweet data”.
Exactly. Putting all their eggs in a single basket like that is just begging an antagonist to bomb the fuck out of them in any future conflict.
I believe you misspelled “Butlerian Jihad”.
Remember when Zuck the Fuck thought everybody would be flocking to his Metaverse of legless apparitions stuck right at the bottom of the uncanny valley?